Boeing South Yard Hangar Expansion
Sector: Commercial • Location: Jacksonville, Florida, United States of America
Source: Dodge USA
Construction of a 201,714-square-foot four-bay hangar building for maintenance, repair and overhaul of KC-46A aircraft used to refuel military planes at Cecil Airport. The project includes an off-taxiway concrete apron with four aircraft positions and a pre-engineered fabric membrane hangar.
- Status
- Under Construction
- Sector
- Commercial, Airport, Aerospace & Defense, Steel, Cement, Manufacturing (Industrial)
- Location
- Jacksonville, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Boeing South Yard Hangar Expansion
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construction of a 201,714-square-foot four-bay hangar building for maintenance, repair and overhaul of KC-46A aircraft used to refuel military planes at Cecil Airport. The project includes an off-taxiway concrete apron with four aircraft positions and a pre-engineered fabric membrane hangar. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Jacksonville |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Airport, Aerospace & Defense, Steel, Cement, Manufacturing (Industrial) |
Article published date | 2024-12-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
