logo
ProjectClosed

Bofill Foundation Offices / GCA Architects

Sector: Steel • Location: Héctor Bareas Bou, Anna Trillo

Source: ArchDaily

Built in 1850, this 21x21-meter block is a testament to the industrial architecture of the time and is considered an example of protected heritage. The design process began with a meticulous exploration to determine which elements of the building should be preserved and restored, carefully removing the layers accumulated during decades of renovations. This approach allowed the true essence of the

Status
Closed
Sector
Steel, Solar, Manufacturing (Industrial), Residential, Metal, Commercial
Location
Spain
Updated
22 Jul 2026
Source
ArchDaily

ConstructChat

Ask ConstructChat about Bofill Foundation Offices / GCA Architects

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Bofill Foundation Offices / GCA Architects” is an infrastructure initiative in the Steel sector, located in Héctor Bareas Bou, Anna Trillo. Taiyo aggregates data on it from ArchDaily.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Built in 1850, this 21x21-meter block is a testament to the industrial architecture of the time and is considered an example of protected heritage. The design process began with a meticulous exploration to determine which elements of the building should be preserved and restored, carefully removing the layers accumulated during decades of renovations. This approach allowed the true essence of the building to emerge, highlighting its original structure.The existing staircase serves as a unifying element, connecting the upper coworking floors with the ground floor area that includes kitchen facilities, the reception area, and the garden. The meticulous restoration of the facades, typical of industrial buildings of the time, has revealed the minimalist and polychromatic beauty of the original stucco.This project not only revitalizes a historic building but also celebrates the dynamic interaction between the past and the present, harmoniously intertwining architectural heritage and contemporary design.The rhythm of the structure and the windows of the existing building are highlighted through the orderly transversal insertion of technical lighting and facilities. Through the superposition of elements with different but harmonious aesthetics, users can literally read the history between the geometric lines formed on the ceiling.Due to the collaborative and educational nature of the client's activity, the project's objective was to create flexible spaces capable of adapting to various scenarios. A series of movable panels and curtains allow for the free configuration of a multifunctional event space of 250 square meters on the ground floor. The central area of this space features a retractable projection surface, allowing for its transformation into a screening room.Text description provided by the architects.Located in the Eixample neighborhood ofBarcelona, this rehabilitation project transforms an old industrial building into open office spaces, adapting the building to the highest standards of comfort, aesthetics, functionality, and energy efficiency. For GCA Architects, projects like this represent opportunities to reveal the layers of history accumulated in the city and enhance the circular economy of cities, prolonging the life of obsolete and inefficient structures.Any new element not only respects the existing one but also contrasts with it, creating a clear distinction between the old and the new. An example of this strategy is the brick walls and wooden beams, structurally reinforced with dark gray painted steel additions. Neutral chromatic tone materials have been used in the meeting rooms, preserving the prominence of the original elements.The rehabilitation has transformed the old factory into a highly efficient building, obtaining the highest energy efficiency rating: an A rating. In order to further improve its performance, 32 photovoltaic panels have been installed, covering a considerable portion of the building's energy expenses.

Location

Country

Spain

Source

Source

ArchDaily

URL

More Details

Record type

Project

Sector

Steel, Solar, Manufacturing (Industrial), Residential, Metal, Commercial

Article published date

2025-06-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project