logo

Bog Dam 4 Bridge Replacement

Sector: Hydro • Location: Milan, New Hampshire, United States of America

Source: Dodge USA

Project
Closed

The contractor will furnish all labor, materials, supervision, and other incidentals necessary to demolish and remove the existing bridge superstructure, and construct a new superstructure utilizing the existing abutments.

Status
Closed
Sector
Hydro, Bridge, Power Transmission, Road, Commercial, Power Generation (CCGT), Water Supply and Storage
Location
Milan, New Hampshire, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Bog Dam 4 Bridge Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Bog Dam 4 Bridge Replacement” is an infrastructure initiative in the Hydro sector, located in Milan, New Hampshire, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The contractor will furnish all labor, materials, supervision, and other incidentals necessary to demolish and remove the existing bridge superstructure, and construct a new superstructure utilizing the existing abutments.

Procurement method

Budget

Location

Country

United States of America (USA)

State

New Hampshire

City

Milan

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Hydro, Bridge, Power Transmission, Road, Commercial, Power Generation (CCGT), Water Supply and Storage

Article published date

2024-07-29

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project