IFC’s proposed investment is a US$ 30 million loan to Bogota Distrito Capital (the “client” or the “City”) to finance “TransMiCable” (“project” or “TMP”), an aerial cableway connecting the low-income mountain neighborhood of Ciudad Bolívar to the City mass-transit system. The project is expected to benefit approximately 80,000 habitants of Ciudad Bolívar by significantly reducing their travel time

Project Information FAQ

Project Information

4 Q
The project “Bog Transmicable” is an infrastructure initiative in the Mass Transit sector, located in Colombia. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

IFC’s proposed investment is a US$ 30 million loan to Bogota Distrito Capital (the “client” or the “City”) to finance “TransMiCable” (“project” or “TMP”), an aerial cableway connecting the low-income mountain neighborhood of Ciudad Bolívar to the City mass-transit system. The project is expected to benefit approximately 80,000 habitants of Ciudad Bolívar by significantly reducing their travel time to the Transmilenio El Tunal station.The project has a cost of US$ 70 million, partially financed by the Colombian Financiera del Desarrollo Territorial S.A or Findeter. The cableway system will have a maximum capacity of approximately 3,500 passengers per hour (one way) and 60,000 passengers per day. There will be 160 cabins which will each seat maximum ten passengers.The TransMiCable cableway will be 3.25 km long, with a height difference of 262 meters and will have three new stations (Juan Pablo II, Manitas and Mirador del Paraiso), which will be around 3000 m2 each) in addition to El Tunal (the terminal station), and 24 towers along the way. The project will be integrated with the main Bogota mass transit system (managed by TRANSMILENIO S.A., 100 % city owned enterprise) at Portal El Tunal Station through an underground passage.In 2013, a third-party engineering and environmental consortium, Consorcio Aqua-Terra-Incoplan, was hired to conduct a feasibility study of the project. The Urban Development Institute (“IDU”, a governmental organization which is responsible for infrastructure projects for Bogota) has since been responsible for the project’s design and construction. To supervise the project’s implementation and progress, IDU hired a third-party consultancy company (Interventoría), which is in charge of the control of the design and monitoring of the contractors, including environmental, social, occupational health and safety requirements.The construction contract was awarded to a special purpose vehicle (“SPV”), formed by Doppelmayr Colombia SAS, Constructora Colpatria S. A. and Icein Ingenieros Constructores SAS (all together as “project contractors” or “consortium”). The construction works started in September 2016. At the time of the initial field appraisal (February 2017), 60 percent of the civil works had been executed. As of October 2018, 100 percent of the civil works were concluded and IDU was conducting the operational tests with the cableway, including the operation of the cabins, pulleys, tweezers, cables, and load test. The operation activities are planned to start in December 2018. TRANSMILENIO S.A. (“TM”) will receive the project from IDU at the end of construction and will be responsible for the operations of the cableway system. A contractor to conduct operations (namely Cable Móvil, the operator) for five years has been selected.This project is part of a proposed IFC investment on the Bogota transportation system, which also includes the Caracas Sur Busway (#38347).

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data