Bogor & Depok Solid Waste Management (West Java)
One of 10,000+ projects Taiyo tracks in Indonesia.
Source: InfraPPPWorld
The project technical profile is as follows:- Operational hours: 8 hours/day, 365 days/year- Operational capacity: 1000 ton/day- Refuse derived fuel with capacity of 1000 ton consist of 3 modules- Compost processing unit with capacity of 100 ton consist of 1 module- Output target: - Compost 45.4 ton per day - RDF 408,6 ton per day
- Status
- Prospective
- Sector
- Water Supply and Storage, Biomass, Waste Processing and Treatment
- Location
- Indonesia
- Updated
- 19 Nov 2026
- Source
- InfraPPPWorld
ConstructChat
Ask ConstructChat about Bogor & Depok Solid Waste Management (West Java)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | project status under review |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The project technical profile is as follows:- Operational hours: 8 hours/day, 365 days/year- Operational capacity: 1000 ton/day- Refuse derived fuel with capacity of 1000 ton consist of 3 modules- Compost processing unit with capacity of 100 ton consist of 1 module- Output target: - Compost 45.4 ton per day - RDF 408,6 ton per day |
Original sector | Water & Waste |
Budget |
Location
Country | Indonesia |
Source
Source | InfraPPPWorld |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Biomass, Waste Processing and Treatment |
Article published date | 2025-03-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Indonesia
- Cirebon CoalFired Power Plant Expansion West Java
- Rantau Dedap Geothermal Power Project South Sumatra
- Cirata Floating Photovoltaic Power Plant
- Jatiluhur I Drinking Water Supply System
- Palapa Ring Central Broadband
- Tangguh LNG Expansion Project, Papua Barat Province
- Melaka PSR-2 Refinery
- Petronas RAPID Project, Southern Johor
