Bogota - Villavicencio Toll Road

Sector: Bridge • Location: Colombia

Source: World Bank Group

Project
Active

The road connecting Bogota to Villavicencio has a total extension of 106.5 km. Coviandes will rehabilitate, maintain and operate 31.3 km (from Villavicencio to Puente Real) and maintain and operate the remaining of the road (this section has been rehabilitated by the government agency Invias). Coviandes is 60% owned by Sociedad Financiera de Los Andes and 40% owned by the Spanish construction comp

Status
Prospective
Sector
Bridge, Government, Road, Manufacturing (Industrial)
Location
Colombia
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Bogota - Villavicencio Toll Road

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Bogota - Villavicencio Toll Road” is an infrastructure initiative in the Bridge sector, located in Colombia. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The road connecting Bogota to Villavicencio has a total extension of 106.5 km. Coviandes will rehabilitate, maintain and operate 31.3 km (from Villavicencio to Puente Real) and maintain and operate the remaining of the road (this section has been rehabilitated by the government agency Invias). Coviandes is 60% owned by Sociedad Financiera de Los Andes and 40% owned by the Spanish construction company Dragados (part of the ACS Group as of 2003). The construction works started on Sep. 1996 and were expected to be completed by 2000. Invias guarantees a minimum traffic flow. The concession contract was granted for 312 months or 26 years. The segment included were: Tramo 2 Portal Bogotá - El Antojo (9,21 Km), Tramo 3 El Antojo - Puente Real (16,3 Km), Tramo 4 Puente Real - Puente Téllez (12,79 Km), Tramo 5 Puente Téllez - Cano Seco (32,13 Km), and Tramo 6 Cano seco - Villavicencio (15,13 Km) The last stretch of the Bogota-Villavicencio highway was finalized and opened in August 2002. The total project required $262 million in total, with the Government paying for the rest. With the final stretch open, the Bogota-Villavicencio highway totals 96km in length. In November 2005, the Instituto Nacional de Concesiones (INCO - Colombia's National Concessions Institute) anounced that it would renegotiate eight highway contracts. These contracts were costing the Government US$131 million (300,000 million pesos) each year in minimum revenue guarantees. Included in those is the contract for the Bogota - Villavicencio Toll Road concession. Conversations for the renegotiation of this contract had started at the time of the anouncement. In January 2010, the government renegotiated the contract to include the expansion of the highway at an additional investment of US$ 1 million (Pesos 1835 million). The new contract was set to expire in August 2023.

Original sector

Transport

Procurement method

Budget

Location

Country

Colombia

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Bridge, Government, Road, Manufacturing (Industrial)

Article published date

2024-06-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project