logo

BOGOTA DIST II

Sector: Power Generation (CCGT) • Location: Colombia

Source: World Bank Group

Project
Closed

The principal objectives of the Second Bogota Power Distribution Project is to achieve greater efficiency in Empresa de Energia Electrica de Bogota (EEEB) operations and to extend electric service to a larger segment of Bogota's population. The project consists mainly of the 1985-90 time-slice of EEEB's distribution and subtransmission program, including the expansion and improvement of Bogota's

Status
Closed
Sector
Power Generation (CCGT), Government
Location
Colombia
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about BOGOTA DIST II

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “BOGOTA DIST II” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Colombia. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The principal objectives of the Second Bogota Power Distribution Project is to achieve greater efficiency in Empresa de Energia Electrica de Bogota (EEEB) operations and to extend electric service to a larger segment of Bogota's population. The project consists mainly of the 1985-90 time-slice of EEEB's distribution and subtransmission program, including the expansion and improvement of Bogota's network, studies to improve EEEB's distribution and operational planning, a training program for EEEB's staff and a program for reducing the system's losses. Around 240,000 new customers will be connected to the power services, 1,100 MVA in subtransmission substation will be built, and about 10 km of 230 kV and 75 km of 115 kV lines will be constructed, together with 350 MVA in distribution substations and 1,000 MVA of distribution transformer capacity and more then 1,400 km of new primary and secondary distribution circuits.

Original sector

(Historic)Electric Power & Other Energy

Location

Country

Colombia

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project