Bogota Urban Services Project
Sector: Mass Transit • Location: Colombia
Source: World Bank Group
The Bogota Urban Services Project will assist the Municipality implement a strategic portion of its three-year Development Plan, aimed at improving urban livability, by increasing access, coverage, quality, reliability, and inter-agency coordination in the provision of transport, water and sanitation, and related basic services, particularly for residents in low-income areas. Through its component
- Status
- Closed
- Sector
- Mass Transit, Road, Water Supply and Storage, Waste Processing and Treatment, Government, Residential
- Location
- Colombia
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Bogota Urban Services Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Bogota Urban Services Project will assist the Municipality implement a strategic portion of its three-year Development Plan, aimed at improving urban livability, by increasing access, coverage, quality, reliability, and inter-agency coordination in the provision of transport, water and sanitation, and related basic services, particularly for residents in low-income areas. Through its components, the project will: 1) improve mobility through actions for continued expansion of the second phase of the Transmilenio System public transport. To this end, bus-lanes will be constructed in the Avenida Suba to Avenida Ciudad de Cali, feeder roads upgraded and rehabilitated to connect neighborhoods to the Transmilenio system, bicycle paths, and sidewalks constructed to facilitate non-motorized transportation, while public transport, road safety, and traffic administration in Bogota will be improved; 2) support the integrated program for urban upgrading, through infrastructure works that comprise planning, and legalizing marginal "barrios" (neighborhoods) supported by technical assistance for land titling and home improvements; construction of storm water drainage systems, and water supply and sewerage systems; rehabilitation of access roads, to allow for the construction of public spaces, and community services; and, 3) strengthen institutional capacity for urban services delivery, through activities that guarantee social, environmental, and financial sustainability. |
Original sector | FY17 - Public Administration,FY17 - Social Protection,FY17 - Transportation,FY17 - Water, Sanitation and Waste Management |
Budget |
Location
Country | Colombia |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Mass Transit, Road, Water Supply and Storage, Waste Processing and Treatment, Government, Residential |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Mass Transit projects in Colombia
- Financiera de Desarrollo Nacional Climate Finance Facility
- Red Ferrea del Atlantico
- Red Ferrea del Pacifico
- Plan de Desarrollo Soy Barranquilla
- Compania del Acueducto y Alcantarillado Metropolitano de Santa Marta
- BOGOTA SUSTAINABLE TRANSPORT FL
- El Dorado International Airport
- Guagua Usme Electric Bus Project
