Bohn Road Structure Replacement
Sector: Water Supply and Storage • Location: Black Earth, Wisconsin, United States of America
Source: Dodge
This project involves bridge removal, salvage and removal of beam guard, removal of beam guard posts, common earthwork, temporary culvert pipe, installing aluminum box culvert with aluminum headwalls and wingwalls (structure excavation and structure backfill incidental), salvaged topsoil, landscaping, temporary erosion control, asphaltic pavement, and gravel shoulder.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | This project involves bridge removal, salvage and removal of beam guard, removal of beam guard posts, common earthwork, temporary culvert pipe, installing aluminum box culvert with aluminum headwalls and wingwalls (structure excavation and structure backfill incidental), salvaged topsoil, landscaping, temporary erosion control, asphaltic pavement, and gravel shoulder. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
