Boiler, Water Heater & Roof Top Equipment Maintenance IQC
Gc bidding · Virginia · Last reported Mar 2025
Source: Dodge
VBCPS will, by this request for proposal, establish an annual contract for the maintenance of the gas fired and electric boilers, gas fired water heaters, gas fired hot air furnaces and roof top equipment; Annual preventive maintenance on Fulton Boilers following the manufactures specifications and other associated work, at the locations listed on the Boiler Equipment Schedule as per the following
- Status
- Prospective
- Sector
- Water Supply and Storage, Manufacturing (Industrial), Oil and Gas, Power Generation (CCGT), Commercial, Education, Government
- Location
- Virginia Beach, Virginia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Boiler, Water Heater & Roof Top Equipment Maintenance IQC
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | VBCPS will, by this request for proposal, establish an annual contract for the maintenance of the gas fired and electric boilers, gas fired water heaters, gas fired hot air furnaces and roof top equipment; Annual preventive maintenance on Fulton Boilers following the manufactures specifications and other associated work, at the locations listed on the Boiler Equipment Schedule as per the following requirements To readily provide VBCPS with a reliable Contractor who will be able to react in a ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Virginia |
City | Virginia Beach |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Manufacturing (Industrial), Oil and Gas, Power Generation (CCGT), Commercial, Education, Government |
Article published date | 2025-03-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
