logo

Bolinas Road Slide Repair at milepost 1.34

Sector: Automotive • Location: California, United States of America

Source: Marin County Department of Public Works (DPW)

Project
Closed

The severe storm events of January 2023 caused a slip out which undermined the edge of the roadway pavement at milepost 1.34 on Bolinas Road, approximately 850 ft east of the intersection with Sky Oaks Road. As this posed an immediate public safety hazard, the eastbound lane was closed to all traffic and the slide area was secured. Since then, traffic control measures have been in place to allow f

Project Information FAQ

Project Information

5 Q
The project “Bolinas Road Slide Repair at milepost 1.34” is an infrastructure initiative in the Automotive sector, located in California, United States of America. Taiyo aggregates data on it from Marin County Department of Public Works (DPW).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The severe storm events of January 2023 caused a slip out which undermined the edge of the roadway pavement at milepost 1.34 on Bolinas Road, approximately 850 ft east of the intersection with Sky Oaks Road. As this posed an immediate public safety hazard, the eastbound lane was closed to all traffic and the slide area was secured. Since then, traffic control measures have been in place to allow for alternating two-way traffic through the westbound lane. The slide repair project will entail building a 230-foot-long retaining wall, adding an updated guardrail and slightly widening the road and shoulder at that location. It is anticipated that the project will begin by early-August and be completed early November.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data