logo

Bolivar Water Treatment Plant Chemical Room Rehab

Sector: Water Supply and Storage • Location: Bolivar, Tennessee, United States of America

Source: Dodge

Project
Closed

The ARPA Water Treatment Plant Chemical Room Rehab is a utility improvement project with several functions for the Bolivar, Tennessee community. Project consists of improvements to chlorine storage building, and exterior piping. Work includes sandblast & paint, CMU improvements, new steel gates, and light fixture.

Status
Closed
Sector
Water Supply and Storage, Steel, Government, Commercial, Chemical (Industrial), Waste Processing and Treatment, Manufacturing (Industrial), Power Transmission, Metal, Power Generation (CCGT)
Location
Bolivar, Tennessee, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Bolivar Water Treatment Plant Chemical Room Rehab

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Bolivar Water Treatment Plant Chemical Room Rehab” is an infrastructure initiative in the Water Supply and Storage sector, located in Bolivar, Tennessee, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The ARPA Water Treatment Plant Chemical Room Rehab is a utility improvement project with several functions for the Bolivar, Tennessee community. Project consists of improvements to chlorine storage building, and exterior piping. Work includes sandblast & paint, CMU improvements, new steel gates, and light fixture.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Tennessee

City

Bolivar

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Steel, Government, Commercial, Chemical (Industrial), Waste Processing and Treatment, Manufacturing (Industrial), Power Transmission, Metal, Power Generation (CCGT)

Article published date

2025-04-14

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project