Bolted-Steel Reservoir Construction
Sector: Commercial • Location: Woodland, Washington, United States of America
Source: Dodge USA
Providing all materials and labor to construct a 106-foot diameter by 29-foot tall, 1.5-million-gallon glass-fused to bolted-steel reservoir, site grading, bioswale, infiltration pond, site water and storm piping, paved reservoir access drive, electrical, telemetry, and instrumentation, site fencing, site restoration, and demolition of existing concrete Reservoir No. 2 (500,000 gallons).
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Providing all materials and labor to construct a 106-foot diameter by 29-foot tall, 1.5-million-gallon glass-fused to bolted-steel reservoir, site grading, bioswale, infiltration pond, site water and storm piping, paved reservoir access drive, electrical, telemetry, and instrumentation, site fencing, site restoration, and demolition of existing concrete Reservoir No. 2 (500,000 gallons). |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | Medium |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
