logo
ProjectOn-Hold / Design

Bolton Road & Phillip Lee Pump Stations Rehabilitation

One of 10,000+ projects Taiyo tracks in Georgia.

Source: Atlanta Watershed

Construction in 1972, the existing 40 million gallons per day (MGD) Bolton Road Sewage Pumping Station is more than 40 years old and is approaching the end of its useful life. The pump station has high pump failure creates, obsolete controls, and other issues associated with an older facility asset. Numerous equipment failures at the facility over the last two years have resulted in several sewage

Status
Failure
Sector
Cement, Waste Processing and Treatment, Road, Water Supply and Storage, Commercial, Government
Location
Georgia, United States of America
Updated
22 Jul 2026
Source
Atlanta Watershed

ConstructChat

Ask ConstructChat about Bolton Road & Phillip Lee Pump Stations Rehabilitation

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Bolton Road & Phillip Lee Pump Stations Rehabilitation” is an infrastructure initiative in the Cement sector, located in Georgia, United States of America (USA). Taiyo aggregates data on it from Atlanta Watershed.

Participants

Sponsoring Agency

Status

Original status

on-hold / design

Taiyo status

Failure

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Construction in 1972, the existing 40 million gallons per day (MGD) Bolton Road Sewage Pumping Station is more than 40 years old and is approaching the end of its useful life. The pump station has high pump failure creates, obsolete controls, and other issues associated with an older facility asset. Numerous equipment failures at the facility over the last two years have resulted in several sewage spills, despite timely corrective and emergency maintenance measures. Additionally, the pump station configuration presents numerous maintenance challenges, including a deep we well that is difficult to access and maintain. The scope of this project includes: Replacing existing pumps with new higher capacity pumps Providing new variable frequency drive units Reconfiguring pump station to facilitate safe access and maintenance Upgrading instrumentation and control system Incorporating odor control technology Refurbishing concrete in the wet well

Budget

Location

Country

United States of America (USA)

State

Georgia

Source

Source reliability

High

Source

Atlanta Watershed

URL

More Details

Record type

Project

Sector

Cement, Waste Processing and Treatment, Road, Water Supply and Storage, Commercial, Government

Article published date

2023-11-03

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project