Bolton Road & Phillip Lee Pump Stations Rehabilitation
One of 10,000+ projects Taiyo tracks in Georgia.
Source: Atlanta Watershed
Construction in 1972, the existing 40 million gallons per day (MGD) Bolton Road Sewage Pumping Station is more than 40 years old and is approaching the end of its useful life. The pump station has high pump failure creates, obsolete controls, and other issues associated with an older facility asset. Numerous equipment failures at the facility over the last two years have resulted in several sewage
- Status
- Failure
- Sector
- Cement, Waste Processing and Treatment, Road, Water Supply and Storage, Commercial, Government
- Location
- Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Atlanta Watershed
ConstructChat
Ask ConstructChat about Bolton Road & Phillip Lee Pump Stations Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | on-hold / design |
Taiyo status | Failure |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construction in 1972, the existing 40 million gallons per day (MGD) Bolton Road Sewage Pumping Station is more than 40 years old and is approaching the end of its useful life. The pump station has high pump failure creates, obsolete controls, and other issues associated with an older facility asset. Numerous equipment failures at the facility over the last two years have resulted in several sewage spills, despite timely corrective and emergency maintenance measures. Additionally, the pump station configuration presents numerous maintenance challenges, including a deep we well that is difficult to access and maintain. The scope of this project includes: Replacing existing pumps with new higher capacity pumps Providing new variable frequency drive units Reconfiguring pump station to facilitate safe access and maintenance Upgrading instrumentation and control system Incorporating odor control technology Refurbishing concrete in the wet well |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source reliability | High |
Source | Atlanta Watershed |
URL |
More Details
Record type | Project |
Sector | Cement, Waste Processing and Treatment, Road, Water Supply and Storage, Commercial, Government |
Article published date | 2023-11-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America (USA)
- Intrenchment Creek Viaduct Rehabilitation
- Clear Creek Chemical System Improvements (Bid Package 1) and System-wide Flow
- Custer Avenue Combined Sewer Control Facility – Additional Screens
- Division Street/Route 65 Interchange Project
- Sorrels Overpass Over I-70
- Route 39 Railroad Crossing Improvements/Overpass/Quiet Zone
- I-44 Rebuild at MO 744/Mulroy Road
- Route D and Truman Boulevard Bridge Rehabilitation
