BOLTON/MOORES MILL STREETSCAPE
The status, timeline and source of this project. A free account opens every field.
Source: Georgia Department of Transportation (GDOT)
The proposed project constructs 5' sidewalk and shoulder (12' wide with curb and gutter) improvements along the westerly Bolton Road between Paul Avenue and Marietta Boulevard. At both the Paul Avenue and Marietta Boulevard intersections the existing curb radius will be re-aligned to provide for the high volume of truck turning movements. For the section between Paul Avenue and Marietta Street t
- Status
- Closed
- Sector
- Car parking, Road, Government, Automotive, Manufacturing (Industrial)
- Location
- Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about BOLTON/MOORES MILL STREETSCAPE
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed project constructs 5' sidewalk and shoulder (12' wide with curb and gutter) improvements along the westerly Bolton Road between Paul Avenue and Marietta Boulevard. At both the Paul Avenue and Marietta Boulevard intersections the existing curb radius will be re-aligned to provide for the high volume of truck turning movements. For the section between Paul Avenue and Marietta Street the existing intermittent sidewalk along with the new improvements will provide for continuous pedestrian mobility. From Marietta Street to Marietta Boulevard new sidewalk will be constructed. Proposed pedestrian lighting will be constructed with breakaway design outside of the sidewalk with a proposed 11 foot horizontal clearance from the travel way. |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Car parking, Road, Government, Automotive, Manufacturing (Industrial) |
Article published date | 2024-05-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
