Bonaire North Gravity Trunk Main Upgrades
Sector: Water Supply and Storage • Location: Warner Robins, Georgia, United States of America
Source: Dodge USA
The project consists of the installation of approximately 2,500 linear feet of 24 gravity sewer PVC, 1,246 linear feet of 24 ductile iron pipe, 701 linear feet of 30 gravity sewer PVC, the removal and replacement of approximately 1,060 linear feet of road and driveway asphalt, the installation of 16 new sanitary sewer manholes, and the removal and/or abandonment of a similar quantity of existing s
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Road, Government, Metal, Steel, Commercial
- Location
- Warner Robins, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Bonaire North Gravity Trunk Main Upgrades
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of the installation of approximately 2,500 linear feet of 24 gravity sewer PVC, 1,246 linear feet of 24 ductile iron pipe, 701 linear feet of 30 gravity sewer PVC, the removal and replacement of approximately 1,060 linear feet of road and driveway asphalt, the installation of 16 new sanitary sewer manholes, and the removal and/or abandonment of a similar quantity of existing sanitary sewer and manholes. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
City | Warner Robins |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Road, Government, Metal, Steel, Commercial |
Article published date | 2025-01-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
