Bondo Wind Farm
Sector: Wind • Location: New South Wales, Australia
Source: Energy Magazine
The Bondo Wind Farm is a project by Neoen located in southern New South Wales, Australia. It involves the construction of up to 164 wind turbines with a generation capacity of 1.2GW, accompanied by two four-hour, 400MW battery energy storage systems (BESS). The wind farm is expected to operate for approximately 30 years and will connect to the grid via existing 132kV and 330kV transmission lines,
- Status
- Prospective
- Sector
- Wind, Energy Storage, Raw Materials
- Location
- New South Wales, Australia
- Updated
- 22 Jul 2026
- Source
- Energy Magazine
ConstructChat
Ask ConstructChat about Bondo Wind Farm
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Bondo Wind Farm is a project by Neoen located in southern New South Wales, Australia. It involves the construction of up to 164 wind turbines with a generation capacity of 1.2GW, accompanied by two four-hour, 400MW battery energy storage systems (BESS). The wind farm is expected to operate for approximately 30 years and will connect to the grid via existing 132kV and 330kV transmission lines, with potential connection to Transgrid's HumeLink project through an approved 500kV transmission line. |
Original sector | Energy |
Location
Country | Australia |
State | New South Wales |
Source
Source | Energy Magazine |
URL |
More Details
Record type | Project |
Sector | Wind, Energy Storage, Raw Materials |
Article published date | 2026-04-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
