logo

Bondo Wind-plus-Storage Project

Sector: Energy Storage • Location: Tumut, New South Wales, Australia

Source: Energy-Storage.News

Project
Planned

The Bondo Wind Farm project involves the development of up to 164 wind turbine generators with a combined capacity of around 1.2GW, paired with two 400MW battery energy storage systems (BESS) each with 4-hour duration, totaling 1,600MWh of storage capacity. The project is located predominantly within State forest land and plantations in southern New South Wales, Australia, covering an area of 41,9

Status
Prospective
Sector
Energy Storage, Raw Materials, Wind
Location
Tumut, New South Wales, Australia
Updated
22 Jul 2026
Source
Energy-Storage.News

ConstructChat

Ask ConstructChat about Bondo Wind-plus-Storage Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Bondo Wind-plus-Storage Project” is an infrastructure initiative in the Energy Storage sector, located in Tumut, New South Wales, Australia. Taiyo aggregates data on it from Energy-Storage.News.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Bondo Wind Farm project involves the development of up to 164 wind turbine generators with a combined capacity of around 1.2GW, paired with two 400MW battery energy storage systems (BESS) each with 4-hour duration, totaling 1,600MWh of storage capacity. The project is located predominantly within State forest land and plantations in southern New South Wales, Australia, covering an area of 41,923 hectares with a disturbance footprint of approximately 1,591 hectares. It includes connection options to existing 132kV and 330kV transmission lines and the approved 500kV HumeLink transmission line. The wind turbines have hub heights up to 200 meters and tip heights up to 300 meters. Construction will require an average workforce of 390 personnel, peaking at 750, with about 20 permanent staff during operation. The project is designed for a 30-year operational life with plans for decommissioning or repowering at the end of life.

Original sector

Energy

Location

Country

Australia

State

New South Wales

City

Tumut

Source

Source

Energy-Storage.News

URL

More Details

Record type

Project

Sector

Energy Storage, Raw Materials, Wind

Article published date

2026-04-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project