logo

Bong Bridge Rehabilitation Project

Sector: Road • Location: Duluth and Superior, Minnesota and Wisconsin, United States

Source: WDIO.com

Project
Planned

The project involves painting spot locations of the existing steel arch structure of the center span, making concrete surface repairs at spot locations of the two piers supporting the center steel arch, removing and replacing the three rubber strip seals of the center tied arch, replacing street lighting on the Minnesota half and Wisconsin approach, applying a concrete sealer to the entire deck in

Project Information FAQ

Project Information

4 Q
The project “Bong Bridge Rehabilitation Project” is an infrastructure initiative in the Road sector, located in Duluth and Superior, Minnesota and Wisconsin, United States. Taiyo aggregates data on it from WDIO.com.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

planned

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project involves painting spot locations of the existing steel arch structure of the center span, making concrete surface repairs at spot locations of the two piers supporting the center steel arch, removing and replacing the three rubber strip seals of the center tied arch, replacing street lighting on the Minnesota half and Wisconsin approach, applying a concrete sealer to the entire deck including Minnesota ramps, and placing new pavement markings on the entire bridge, Minnesota ramps, and Wisconsin approach. During construction, US 2 will remain open to at least one lane of through traffic in each direction. The Minnesota side ramps will be closed at various times for lighting installation, concrete sealer application, and painting. The sidewalk across the bridge is expected to be closed for about two to three weeks. Construction is expected to complete by early December.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data