Bonga North Project
Sector: Water Supply and Storage • Location: Nigeria
Source: Okay.ng
The Bonga North deep-water project by Shell Nigeria Exploration and Production Company Limited (SNEPCo) aims to sustain Nigeria's oil and gas output by connecting to the existing Bonga FPSO facility, adding 16 new wells and enhancing production capacity. The project is expected to achieve a peak production of 110,000 barrels of oil per day, with first oil anticipated by the end of the decade.
- Status
- Prospective
- Sector
- Water Supply and Storage, Oil and Gas
- Location
- Nigeria
- Updated
- 22 Jul 2026
- Source
- Okay.ng
ConstructChat
Ask ConstructChat about Bonga North Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Bonga North deep-water project by Shell Nigeria Exploration and Production Company Limited (SNEPCo) aims to sustain Nigeria's oil and gas output by connecting to the existing Bonga FPSO facility, adding 16 new wells and enhancing production capacity. The project is expected to achieve a peak production of 110,000 barrels of oil per day, with first oil anticipated by the end of the decade. |
Original sector | Energy |
Budget |
Location
Country | Nigeria |
Source
Source | Okay.ng |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Oil and Gas |
Article published date | 2025-01-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
