Bonner Maker Space
Planning schematics · Georgia · Last reported Jul 2025
Source: Dodge
Construction management at-risk services for renovated to address the needs of a Maker Space that provides space for students and faculty to create innovative projects as part of instructional programs, research or business entrepreneurship. It is approximately 4,500 square feet with exterior renovation, open flexible lab space with new lighting and power availability, new northwest entrance, and
- Status
- Prospective
- Sector
- Power Generation (CCGT), Commercial, Education
- Location
- Carrollton, Georgia, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Bonner Maker Space
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planning schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Construction management at-risk services for renovated to address the needs of a Maker Space that provides space for students and faculty to create innovative projects as part of instructional programs, research or business entrepreneurship. It is approximately 4,500 square feet with exterior renovation, open flexible lab space with new lighting and power availability, new northwest entrance, and two single stall restrooms. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
City | Carrollton |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Commercial, Education |
Article published date | 2025-07-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
