logo
ProjectBidding

Bonner Springs Garfield Ave Culvert Replacement

The status, timeline and source of this project. A free account opens every field.

Source: Dodge

Storm Sewer. Bids to Owner Public - Local November 17 at 02:00 PM (CST)

Status
Prospective
Sector
Waste Processing and Treatment, Water Supply and Storage, Steel, Metal, Power Transmission, Manufacturing (Industrial), Power Generation (CCGT), Cement, Government, Rail
Location
Lake Of The Forest, Kansas, United States of America
Updated
19 Nov 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Bonner Springs Garfield Ave Culvert Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Bonner Springs Garfield Ave Culvert Replacement” is an infrastructure initiative in the Waste Processing and Treatment sector, located in Lake Of The Forest, Kansas, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

bidding

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Storm Sewer. Bids to Owner Public - Local November 17 at 02:00 PM (CST)

Original sector

Water, Sanitation And Waste Management

Budget

Location

Country

United States of America (USA)

State

Kansas

City

Lake Of The Forest

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Waste Processing and Treatment, Water Supply and Storage, Steel, Metal, Power Transmission, Manufacturing (Industrial), Power Generation (CCGT), Cement, Government, Rail

Article published date

2026-11-09

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project