logo

Bons Ventos Wind Farm Phase II

Sector: Commercial • Location: Brazil

Source: World Bank Group

Project
Active

The Brazilian Group Servtec, was granted the authorization to build five wind power plants located in the state of Ceara, municipalities of Ibiapina and Ubajara (86.1 MW in total capacity). The 35-year contracts were signed with the regulatory agency ANEEL starting in June 2014. The company created one special purpose company to manage the projects listed below: Geradora Eolica Bons Ventos da Ser

Project Information FAQ

Project Information

5 Q
The project “Bons Ventos Wind Farm Phase II” is an infrastructure initiative in the Commercial sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Brazilian Group Servtec, was granted the authorization to build five wind power plants located in the state of Ceara, municipalities of Ibiapina and Ubajara (86.1 MW in total capacity). The 35-year contracts were signed with the regulatory agency ANEEL starting in June 2014. The company created one special purpose company to manage the projects listed below: Geradora Eolica Bons Ventos da Serra 2 S.A. Bons Ventos Cacimbas 7 (16.8 MW) Bons Ventos Cacimbas 5 (21 MW) Bons Ventos Cacimbas 4 (10.5 MW) Bons Ventos Cacimbas 3 (14.7 MW) Bons Ventos Cacimbas 2 (23.1 MW) The total investment in the power plants was estimated at US$ 113.2 million (BRL 379.1 million). Financial closure was achieved in December 2016, when the sponsor was granted a US$ 65.4 million (BRL 225.5 million) loan from the Brazilian bank BNDES. Commercial operations are expected to begin by the end of 2017. The government periodically runs public bidding for the sale of energy to the country´s distribution companies. Geradora Eolica Bons Ventos da Serra 2 won the public bidding that took place in December 2013 by offering an average tariff of US$ 35.4/MWh (BRL 122/MWh). The project companies signed 20-year power purchase agreements with the several electricity distribution companies. The company was granted the right to take part in the government program called Regime Especial de Incentivos para o Desenvolvimento da Infra-Estrutura (Reidi). Companies selected to take part in this program were given tax cuts in the acquisition of capital equipment and construction material acquired both in the domestic and international markets (this incentive represented a cost reduction of about 9.25%). In addition, the company was allowed to use accelerated depreciation methods of accounting for construction expenditures.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data