logo

Bons Ventos Wind Farm Phase II

Sector: Commercial • Location: Ceara, Brazil

Source: World Bank Group

Project
Active

The Brazilian Group Servtec, was granted the authorization to build five wind power plants located in the state of Ceara, municipalities of Ibiapina and Ubajara (86.1 MW in total capacity). The 35-year contracts were signed with the regulatory agency ANEEL starting in June 2014. The company created one special purpose company to manage the projects listed below: Geradora Eolica Bons Ventos da Ser

Status
Prospective
Sector
Commercial, Wind, Government, Power Generation (CCGT), Raw Materials, Steel, Manufacturing (Industrial)
Location
Ceara, Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Bons Ventos Wind Farm Phase II

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Bons Ventos Wind Farm Phase II” is an infrastructure initiative in the Commercial sector, located in Ceara, Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Brazilian Group Servtec, was granted the authorization to build five wind power plants located in the state of Ceara, municipalities of Ibiapina and Ubajara (86.1 MW in total capacity). The 35-year contracts were signed with the regulatory agency ANEEL starting in June 2014. The company created one special purpose company to manage the projects listed below: Geradora Eolica Bons Ventos da Serra 2 S.A. Bons Ventos Cacimbas 7 (16.8 MW) Bons Ventos Cacimbas 5 (21 MW) Bons Ventos Cacimbas 4 (10.5 MW) Bons Ventos Cacimbas 3 (14.7 MW) Bons Ventos Cacimbas 2 (23.1 MW) The total investment in the power plants was estimated at US$ 113.2 million (BRL 379.1 million). Financial closure was achieved in December 2016, when the sponsor was granted a US$ 65.4 million (BRL 225.5 million) loan from the Brazilian bank BNDES. Commercial operations are expected to begin by the end of 2017. The government periodically runs public bidding for the sale of energy to the country´s distribution companies. Geradora Eolica Bons Ventos da Serra 2 won the public bidding that took place in December 2013 by offering an average tariff of US$ 35.4/MWh (BRL 122/MWh). The project companies signed 20-year power purchase agreements with the several electricity distribution companies. The company was granted the right to take part in the government program called Regime Especial de Incentivos para o Desenvolvimento da Infra-Estrutura (Reidi). Companies selected to take part in this program were given tax cuts in the acquisition of capital equipment and construction material acquired both in the domestic and international markets (this incentive represented a cost reduction of about 9.25%). In addition, the company was allowed to use accelerated depreciation methods of accounting for construction expenditures.

Original sector

Energy

Budget

Location

Country

Brazil

State

Ceara

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Wind, Government, Power Generation (CCGT), Raw Materials, Steel, Manufacturing (Industrial)

Article published date

2024-05-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project