logo
ProjectClosed

Booking.com City Campus / UNStudio

Closed · The Netherlands · Last reported Jun 2023

Source: ArchDaily

The new campus is also state-of-the-art in terms of all sustainable solutions and achieved a BREEAM Excellent design certificate. In addition, a connected building management system is incorporated to enable a frictionless space for all employees and operations staff alike.Underfloor air distribution is used to provide fresh air in close proximity to the users, while radiant ceilings allow for ver

Status
Closed
Sector
Commercial, Residential, Warehouse
Location
Netherlands
Updated
22 Jul 2026
Source
ArchDaily

ConstructChat

Ask ConstructChat about Booking.com City Campus / UNStudio

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Booking.com City Campus / UNStudio” is an infrastructure initiative in the Commercial sector, located in The Netherlands. Taiyo aggregates data on it from ArchDaily.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The new campus is also state-of-the-art in terms of all sustainable solutions and achieved a BREEAM Excellent design certificate. In addition, a connected building management system is incorporated to enable a frictionless space for all employees and operations staff alike.Underfloor air distribution is used to provide fresh air in close proximity to the users, while radiant ceilings allow for very comfortable heating and cooling. Special attention has also been given to the acoustics in both the office spaces and the atria, while alongside the generous daylight throughout the building, high-quality artificial light with very low glare enhances visual comfort.The flexible and generous design of the work floors also made it possible to create numerous different working and meeting spaces. The variety of these meeting spaces and amenities gives the employees freedom of choice to ‘design their day’ for a healthy and productive work life.A collaborative approach to interior design.While UNStudio designed the urban approach and architecture for the campus, including the continuous spatial experience of the building, Lead Interior Architect, HofmanDujardin designed the interior masterplan and was responsible for the collaboration and supervision of the interior design.Creating a work environment that is socially, physically, and mentally healthy for Booking.com’s employees was also a key aim of the design from the outset.The overall design of the campus reflects the functional, transparent, and connected way of working at Booking.com and creates an integrated, flexible urban campus that reflects how we will work, live and connect in the future.Booking.com was keen for its headquarters to be a reflection of its leading position in the tech world and therefore considered the building to be an important tool in attracting and retaining top young talent from the industry. This goal served as the starting point for the design. During the research phase, visits were made to other successful tech company buildings. However, Booking.com wanted their building to provide a truly unparalleled experience for their employees, so a completely new, out-of-the-box, and unique concept was required.The architecture of the Booking.com City Campus.In 2015, Booking.com, together with BPD (Bouwfonds Property Development), selected UNStudio to design their new campus in the center ofAmsterdam. From the outset, the goal for the buildings was to create a healthy community; to bring employees together and to attract new talent from across the globe.This includes a variety of amenities in the form of 28 micro holiday destination breakout spaces. These communal areas are spread throughout the campus for use by the employees and are unique destination-themed spaces, which include service points, restaurants, and breakout spaces with pantries.Throughout the building, the architecture nudges employees to move by fostering engaging environments and by encouraging physical movement by use of stairs, bridges, and galleries across all levels, including the rooftop. Even the emergency staircases become part of this concept, as untypically these are glazed along the atrium side, which not only encourages daily use but also offers light views from the stairs and visibility from the other spaces in the building.

Location

Country

Netherlands

Source

Source

ArchDaily

URL

More Details

Record type

Project

Sector

Commercial, Residential, Warehouse

Article published date

2025-06-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project