Boone Dam Safety Modification Project
Sector: Water Supply and Storage • Location: Tennessee, United States
Source: POWER Magazine
The Boone Dam Safety Modification Project was initiated by the Tennessee Valley Authority (TVA) to address a sinkhole discovered near the dam's embankment. The project involved extensive repairs and the installation of a composite seepage barrier to ensure the dam's safety and integrity, marking it as the largest dam safety modification project in TVA's history.
- Status
- Closed
- Sector
- Water Supply and Storage, Hydro, Power Generation (CCGT), Government
- Location
- Tennessee, United States of America
- Updated
- 22 Jul 2026
- Source
- POWER Magazine
ConstructChat
Ask ConstructChat about Boone Dam Safety Modification Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Boone Dam Safety Modification Project was initiated by the Tennessee Valley Authority (TVA) to address a sinkhole discovered near the dam's embankment. The project involved extensive repairs and the installation of a composite seepage barrier to ensure the dam's safety and integrity, marking it as the largest dam safety modification project in TVA's history. |
Original sector | Renewables |
Location
Country | United States of America (USA) |
State | Tennessee |
Source
Source | POWER Magazine |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Hydro, Power Generation (CCGT), Government |
Article published date | 2025-03-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
