Booster Pump Station Improvements
Sector: Water Supply and Storage • Location: Canton, Georgia, United States of America
Source: Dodge
This project, the Contractor agrees to furnish all materials and equipment and to perform all labor necessary to construct the proposed water system improvements as shown on the construction drawings. More specifically, the work shall consist of electrical and pump upgrades at two 2 different existing booster pump station sites, mobilization/demobilization, bonds, insurance, delivery of materials,
- Status
- Closed
- Sector
- Water Supply and Storage, Power Generation (CCGT), Commercial, Waste Processing and Treatment, Cable car, Government, Telecommunications, Automotive
- Location
- Canton, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Booster Pump Station Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project, the Contractor agrees to furnish all materials and equipment and to perform all labor necessary to construct the proposed water system improvements as shown on the construction drawings. More specifically, the work shall consist of electrical and pump upgrades at two 2 different existing booster pump station sites, mobilization/demobilization, bonds, insurance, delivery of materials, taxes, and all other appurtenances necessary for completion of the Work as shown in the Drawings... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
City | Canton |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Commercial, Waste Processing and Treatment, Cable car, Government, Telecommunications, Automotive |
Article published date | 2025-03-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
