Booster Pump Station Rehabilitation
Sector: Wind • Location: Oak Park, Michigan, United States of America
Source: Dodge USA
The scope of work for the project includes the following: 1. Demolition of four (4) variable frequency drives (VFDs), (2) vertical turbine pumps, and adjacent valves and piping. 2. Install (1) new vertical turbine pump, (3) check valves, (1) butterfly valves, and adjacent piping. Replace concrete pipe supports in kind. 3. Epoxy paint all pipe, pumps, and valves and ceiling structural steel on lowe
- Status
- Closed
- Sector
- Wind, Cement, Steel, Waste Processing and Treatment, Car parking, Automotive, Government, Metal, Commercial, Water Supply and Storage
- Location
- Oak Park, Michigan, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Booster Pump Station Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The scope of work for the project includes the following: 1. Demolition of four (4) variable frequency drives (VFDs), (2) vertical turbine pumps, and adjacent valves and piping. 2. Install (1) new vertical turbine pump, (3) check valves, (1) butterfly valves, and adjacent piping. Replace concrete pipe supports in kind. 3. Epoxy paint all pipe, pumps, and valves and ceiling structural steel on lower level. Include abrasive blasting for surface preparation. 4. Replace existing corroded flange b... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Michigan |
City | Oak Park |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Wind, Cement, Steel, Waste Processing and Treatment, Car parking, Automotive, Government, Metal, Commercial, Water Supply and Storage |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Wind projects in United States of America
- NTIA Tribal Broadband Connectivity Program
- Pump Station 3 Replacement
- Reston Town Center Expansion
- 108th Avenue Northeast transit queue jump
- 4520 Barrett Road Tentative Parcel Map and Abandonment
- Abandonment Of Portions Of An I.O.D. And P.U.E. Located Within 4110 Winding Bluff Lane
- Whisper Wind Temporary Hardship Mobile Home
- 4450 Manzanita Ave (Winding Ranch) Pre Application Meeting
