Boot Barn & Primark
Closed · Illinois · Last reported Jul 2024
Source: Dodge USA
This project includes the interior demolition and buildout of an existing Buy Buy Baby/Bed Bath & Beyond space, for new future Boot Barn and Primark stores in Gurnee, IL The scope of work includes, but is not limited to: Building Demo, concrete sawcutting, Cast in Place Concrete, Masonry, Steel, aluminum composite panel, EIFS, Caulking, Roofing, Door & Hardware, Overhead Doors, Storefront, framing
- Status
- Closed
- Sector
- Commercial, Metal, Cement, Power Generation (CCGT), Steel, Residential, Manufacturing (Industrial)
- Location
- Gurnee, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Boot Barn & Primark
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project includes the interior demolition and buildout of an existing Buy Buy Baby/Bed Bath & Beyond space, for new future Boot Barn and Primark stores in Gurnee, IL The scope of work includes, but is not limited to: Building Demo, concrete sawcutting, Cast in Place Concrete, Masonry, Steel, aluminum composite panel, EIFS, Caulking, Roofing, Door & Hardware, Overhead Doors, Storefront, framing & Drywall, Painting, awnings, Fire protection, Plumbing, HVAC, Electrical, & Fire Alarm. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Gurnee |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Metal, Cement, Power Generation (CCGT), Steel, Residential, Manufacturing (Industrial) |
Article published date | 2024-07-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- I-20 FROM CARROLL COUNTY LINE TO 0.15 MI E OF SR 5
- SR 22 SPUR FROM 0.23 MI W OF CR 2111/REESE ROAD TO SR 22
- RELOC & STORE 121 BRIDGE BEAMS/529 R-E PANELS/PRES.PKWY
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
- I-90 eastgate to sr 900
