logo

Borcelik Fin.

Sector: Warehouse • Location: Turkiye

Source: International Finance Corporation (IFC)

Project
Hold

Borçelik Çelik Sanayii Ticaret A.S. (“Borcelik”, the “Company”), founded in 1990, is the second largest private sector flat steel manufacturer and galvanized steel producer in Turkiye ().  The Company has a production capacity of 1.5 million (m) tons of hot dip galvanized steel, cold-rolled steel, and hot-rolled steel, all of which are industrial raw materials that serve

Project Information FAQ

Project Information

4 Q
The project “Borcelik Fin.” is an infrastructure initiative in the Warehouse sector, located in Turkiye. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

hold

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Borçelik Çelik Sanayii Ticaret A.S. (“Borcelik”, the “Company”), founded in 1990, is the second largest private sector flat steel manufacturer and galvanized steel producer in Turkiye (https://www.borcelik.com/en).  The Company has a production capacity of 1.5 million (m) tons of hot dip galvanized steel, cold-rolled steel, and hot-rolled steel, all of which are industrial raw materials that serve the automotive, white goods, and construction sectors, among others. Borcelik’s main plant is located in Gemlik (near Istanbul in Turkey) on a 240,000 square meter (sqm) area. Two smaller steel service centers are located in Bursa (20k sqm) and Manisa (10k sqm).IFC is considering a financing package of up to US$210M to Borcelik to finance the modernization and expansion program as well as working capital requirements, which will include the installation of a 1.6 mt Pickling Line and Tandem Cold Mill (PLTCM) upstream line combined with a 0.5 mt Continuous Galvanizing and Annealing Line (CGAL) downstream line (“Project”). The IFC loan will be committed in two phases over a period of 3 years, with the first phase consisting of a senior, corporate A loan of up to US$80M, a MCPP Trust Loan of up to US$50M, and a B1/Parallel loan of up to US$30M, and the second phase consisting of an A Loan and B1/Parallel loan of up to US$50M.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data