Bordeaux Métropole Aréna
Sector: Car parking • Location: France
Source: Bouygues
Architecture Like a stone along the banks of the Garonne river, the white structure of the Bordeaux Métropole Arena overlooks Floirac, a booming community within the Bordeaux metropolitan area. The complex is designed like an amphitheatre. This posed a challenge for the teams at Bouygues Bâtiment Centre Sud-Ouest, who had to build a double concrete curve whilst maintaining the same shade of white
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Architecture Like a stone along the banks of the Garonne river, the white structure of the Bordeaux Métropole Arena overlooks Floirac, a booming community within the Bordeaux metropolitan area. The complex is designed like an amphitheatre. This posed a challenge for the teams at Bouygues Bâtiment Centre Sud-Ouest, who had to build a double concrete curve whilst maintaining the same shade of white on the entire complex. The main strength of the project is its modularity: through a motorised system of retractable stands enabling quick configuration changes, the capacity can range from 2,500 to 11,000 seats to accommodate all kinds of events and play host to an eclectic programme featuring concerts, shows, indoor sporting events, etc. Environment Bordeaux Métropole Arena has also made itself a fixture of local life. In keeping with a circular economy-based strategy, a portion of the materials used on site were fully recycled or repackaged. For example, some of the formwork specially designed for the shell of the building was donated to the Espace Darwin skate park. Local presence This project primarily hired local employees. In fact, 80% of the companies who worked at the site were based in Nouvelle Aquitaine. In addition, 35% of the work packages were awarded to SMEs and 18,000 working hours were set aside for workplace integration schemes. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
