Border West Expressway
Sector: Car parking • Location: Texas, United States of America
Source: Federal Highway Administration (FHWA)
The Border West Expressway project is located west of downtown El Paso, south of I-10 and extends approximately 7.4 miles from Racetrack Drive near Doniphan Road and New Mexico 273 East to US 54 east of downtown El Paso. The project consists of:
Construction of a four-lane toll road on elevated structure from Racetrack Drive to the
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Close |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Border West Expressway project is located west of downtown El Paso, south of I-10 and extends approximately 7.4 miles from Racetrack Drive near Doniphan Road and New Mexico 273 East to US 54 east of downtown El Paso. The project consists of: Construction of a four-lane toll road on elevated structure from Racetrack Drive to the end of the existing Loop 375 near Santa Fe Street (approximately 5.6 miles) Reconstruction of existing Loop 375 lanes from Santa Fe Street to Park Street on elevated structure providing access to local traffic and remaining non-tolled (approximately 1.8 miles) Addition of multi-ramp interchanges connecting Executive Center Boulevard and Spur 1966 Construction of a multi-ramp interchange connecting Loop 375 with Paisano Drive (US 85) and Delta Street, providing eastbound and westbound access to the city's center The project will close the Loop 375 gap that currently exists along the border in the downtown El Paso area and create an alternate route to I-10, improving system reliability and regional mobility. Currently only I-10 provides continuous high-speed, east-west connectivity through El Paso. The existing Loop 375 and US 85 (Paisano Drive) have numerous signalized intersections and heavy pedestrian activity. The project's design-build contract includes a comprehensive maintenance agreement with three 5-year terms, the first of which is mandatory. The project's developer must perform routine, preventative, and lifecycle maintenance of all assets, as well as incident management. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
