Borusan EnBW Wind power expansion (115.4MW)
Sector: Wind • Location: Turkey
Source: World Bank Group
This project consists of the development and construction of 116 MW of onshore wind-energy capacity in Türkiye, with sites located in Sivas and Tekirdag. The initiative includes the implementation of the 80 MW Pelit Wind Power Plant (RES) and a 36 MW capacity expansion at the Balabanli RES. Once operational, these projects will generate approximately 382 GWh of renewable energy annually, contribut
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | This project consists of the development and construction of 116 MW of onshore wind-energy capacity in Türkiye, with sites located in Sivas and Tekirdag. The initiative includes the implementation of the 80 MW Pelit Wind Power Plant (RES) and a 36 MW capacity expansion at the Balabanli RES. Once operational, these projects will generate approximately 382 GWh of renewable energy annually, contributing to a reduction of 243,000 tonnes of CO2 emissions per year. The sponsor for this initiative is Borusan EnBW Enerji, a leading renewable energy company in Türkiye and a joint venture between Borusan Holding and Germany’s EnBW AG. The total project financing amounts to $152.3 million, secured from a consortium of lenders including the European Bank for Reconstruction and Development (EBRD), Akbank, Türkiye Is Bankasi, and the Industrial Development Bank of Turkey (TSKB). Of this, the EBRD is providing $60 million (€55 million). Financial close is achieved in August, 2024. https://www.ebrd.com/news/2024/ebrd-financing-to-expand-renewables-capacity-in-trkiye.html; https://www.ebrd.com/work-with-us/projects/psd/55447.html; https://www.borusanenbw.com.tr/basin-odasi/basin-bultenleri/borusan-enbw-enerji-nin-ruzgar-enerji-santrali-yatirimlari-icin-120-milyon-dolarlik-finansman https://www.ebrd.com/news/2024/ebrd-financing-to-expand-renewables-capacity-in-trkiye.html; https://www.ebrd.com/work-with-us/projects/psd/55447.html; https://www.borusanenbw.com.tr/basin-odasi/basin-bultenleri/borusan-enbw-enerji-nin-ruzgar-enerji-santrali-yatirimlari-icin-120-milyon-dolarlik-finansman |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
