Bosnia and Herzegovina Regional Railway Project
Sector: Mass Transit • Location: Bosnia and Herzegovina
Source: European Bank for Reconstruction and Development (EBRD)
The proposed project will comprise a programme of track renewal on key sections of the north-south corridor Vc and the east-west section, which runs parallel to Corridor X, together with rehabilitation of the station signalling system and purchase of track machinery. The project will also support the restructuring of the railways in BiH, through the separation of infrastructure from operations and
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | complete |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The proposed project will comprise a programme of track renewal on key sections of the north-south corridor Vc and the east-west section, which runs parallel to Corridor X, together with rehabilitation of the station signalling system and purchase of track machinery. The project will also support the restructuring of the railways in BiH, through the separation of infrastructure from operations and joint financing with European Investment Bank of these important regional rail links. The project will facilitate transition in the following ways: The Client will be the Government of Bosnia and Herzegovina. The implementing agency will be Bosnia and Herzegovina Railways Public Corporation (BHRPC) on behalf of ZBH and ZRS. EURO 70 million Sovereign Loan to Bosnia and Herzegovina. EURO 194 million. The project is classified B/1. The project is likely to improve the safety and environmental standards as well as improve operation and maintenance of the railway systems. The existing facilities will need to undergo an Environmental Analysis and Audit to identify and assess the current environmental, health and safety conditions and the likely impact of measures proposed under this project. The due diligence will need to review the status of the implementation of existing Environmental Action Plans and define measures for supporting the introduction of the modern environmental management in these two railway companies. Technical co-operation funds are being sought for assistance for detailed design, procurement and railway restructuring. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
