Boss Range Road
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Widen and improve roadway The City of Justin, Texas, will receive sealed bids for the referenced project which involves the reconstruction of Boss Range Road between FM 407 and Trail Creek bridge. The project consists of approximately 4,700 SY of 6 (2 Type D on 4 Type B) HMAC pavement on 8 lime stabilized subgrade and other associated items.
- Status
- Closed
- Sector
- Bridge, Road, Government, Commercial
- Location
- Justin, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Boss Range Road
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Widen and improve roadway The City of Justin, Texas, will receive sealed bids for the referenced project which involves the reconstruction of Boss Range Road between FM 407 and Trail Creek bridge. The project consists of approximately 4,700 SY of 6 (2 Type D on 4 Type B) HMAC pavement on 8 lime stabilized subgrade and other associated items. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Justin |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Bridge, Road, Government, Commercial |
Article published date | 2024-04-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Bridge projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- I-95 NB @ ST MARYS RIVER - BRIDGE REHAB
- CR 111/ CAIN CREEK RD--CULVERT & APPR @ CROOKED CREEK TRIB
- JOINT REHABILITATION PROJECT ON 12 BRIDGES IN DIST 5|511440
- SR 112 BRIDGE OVER BOLLINGER CREEK| IMPROVE CR 77 FOR DETOUR
- CR 243/BROOKS ROAD @ ALCOVY RIVER
- I-185 @ SR 116; MOUNTAIN OAK CREEK & HOPEWELL CHURCH RD
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
