logo

Boston Central Artery/Tunnel Project, Massachusetts

Sector: Airport • Location: Massachusetts, United States of America

Source: Federal Highway Administration (FHWA)

Project
Close

The project built a framework for future growth in the city and New England in general. The Boston, Massachusetts had a world-class traffic problem called the Central Artery. The Central Artery was an elevated highway running through the center of downtown. When it opened in 1959, the Central Artery carried about 75,000 vehicles a day. In the early 1990s it carried upwards of 200,000 making i

Project Information FAQ

Project Information

5 Q
The project “Boston Central Artery/Tunnel Project, Massachusetts” is an infrastructure initiative in the Airport sector, located in Massachusetts, United States of America. Taiyo aggregates data on it from Federal Highway Administration (FHWA).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Close

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project built a framework for future growth in the city and New England in general. The Boston, Massachusetts had a world-class traffic problem called the Central Artery. The Central Artery was an elevated highway running through the center of downtown. When it opened in 1959, the Central Artery carried about 75,000 vehicles a day. In the early 1990s it carried upwards of 200,000 making it one of the most congested highways in the United States. The accident rate on the Central Artery was four times the national average. The two tunnels between downtown Boston and East Boston/Logan Airport had the same issue. Without major improvements, Boston expected a traffic jam for up to 16 hours a day by 2010. The annual cost to motorists from this congestion was an estimated $500 million. Costs included a high accident rate, wasted fuel from traffic, and late deliveries. The elevated highway displaced 20,000 residents. It also cut off the North End and Waterfront neighborhoods from downtown. This limited these areas' ability to take part in the city's economic life. The Boston’s Big Dig project replaced the elevated deteriorating six-lane elevated Central Artery (I-93) with an underground expressway beneath the existing road, extended the I-90 tollway underground to the South Boston Seaport and Logan International Airport, built a new 10-lane bridge over the Charles River, and built a new 4-lane tunnel under Boston's harbor and ship channel. A new underground transit line (Silver Line) was also built as part of a package of transportation improvements. By removing the elevated highway, the project created more than 300 acres of open land while reconnecting downtown Boston to the waterfront and spur economic development. The project has been called the largest, most challenging highway project in U.S. history.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data