Boston Central Tunnel - Package 1 (Signal Upgrades)
One of 10,000+ projects Taiyo tracks in Massachusetts.
Source: Dodge
Work consists of signal work, communications work, and electrical work necessary to facilitate the replacement of 25Hz track circuits associated with existing signal control cases at Copley, Park Street and Government Center stations, and the addition of a new fiber cable between North Station and all westerly portals throughout the Green Line Central Tunnel as described in the drawings and specif
- Status
- Prospective
- Sector
- Telecommunications, Tunnel, Government, Car parking, Road, Automotive, Commercial, Power Generation (CCGT), Manufacturing (Industrial)
- Location
- Boston, Massachusetts, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Boston Central Tunnel - Package 1 (Signal Upgrades)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Work consists of signal work, communications work, and electrical work necessary to facilitate the replacement of 25Hz track circuits associated with existing signal control cases at Copley, Park Street and Government Center stations, and the addition of a new fiber cable between North Station and all westerly portals throughout the Green Line Central Tunnel as described in the drawings and specifications. A more detailed description of the work is provided in section 01010 Summary of Work. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Boston |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Telecommunications, Tunnel, Government, Car parking, Road, Automotive, Commercial, Power Generation (CCGT), Manufacturing (Industrial) |
Article published date | 2025-07-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Telecommunications projects in United States of America
- ATLANTA STREETCAR EAST EXTENSION FROM JACKSON ST TO IRWIN ST
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- UPGRADE (E) WIRELESS TELECOMMUNICATIONS FACILITY.ADD 2 ANTENNAS ADD 3 RRU'S ADD 1 OVP SURGE PROTECTOR ADD 1 HYBRID
- INSTALLATION OF A NEW SMALL CELL WIRELESS FACILITY IN THE PUBLIC RIGHT OF WAY
- REMOVE AND REPLACE NEW WIRELESS ANTENNAS AND RELATED EQUIPMENT
- INSTALL 1 FLAGPOLE,6 ANTENNAS,1 RADOME,3 POWER CABLES,3 HYBR D CABLES,JUMPERS FROM RRUS TO ANTENNAS,NEW 10'X10'LEASE..SEE
- DISH WIRELESS COLLOCATION ONTO EXISTING WIRELESS FACILITY AND GROUND BASE STATION
- COLLOCATION OF (3)NEW ANTENNAS & ASSOCIATED CABLES & EQUIPMT PER ATTACHED SCOPE OF WORK. 6904 COMPLIANT AT&T (E)CELL SITE
