logo
ProjectPending

Boston Metal Bra

One of 10,000+ projects Taiyo tracks in Brazil.

Source: International Finance Corporation (IFC)

Boston Metal (“BM” or the “company”, ) was founded in 2012 as a spinout from the Massachusetts Institute of Technology. The company patented the Molten Oxide Electrolysis (MOE), an electrochemical process that uses direct electric current and an anode to separate chemical compounds into their constituent parts.  In 2022, BM established a subsidiary named Boston Electrom

Status
Prospective
Sector
Steel, Nuclear, Warehouse, Metal, Chemical (Industrial), Manufacturing (Industrial), Power Generation (CCGT), Government
Location
Brazil
Updated
22 Jul 2026
Source
International Finance Corporation (IFC)

ConstructChat

Ask ConstructChat about Boston Metal Bra

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Boston Metal Bra” is an infrastructure initiative in the Steel sector, located in Brazil. Taiyo aggregates data on it from International Finance Corporation (IFC).

Participants

Sponsoring Agency

Status

Original status

pending

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Boston Metal (“BM” or the “company”, https://www.bostonmetal.com/) was founded in 2012 as a spinout from the Massachusetts Institute of Technology. The company patented the Molten Oxide Electrolysis (MOE), an electrochemical process that uses direct electric current and an anode to separate chemical compounds into their constituent parts.  In 2022, BM established a subsidiary named Boston Electrometallurgical Corporation Brasil Ltda (“BMB”) in Minas Gerais, Brazil to recover high-value metals from by-products of mining and metallurgical operations that do not currently have an economically viable processing alternative due to the low concentration of the minerals of interest. BMB is developing its project in three phases: pilot (Phase 0), industrial phase 1 (Phase I) and industrial phase 2 (Phase II). Facilities are in the municipality of Coronel Xavier Chaves, 3.5km from the urban center and 14km away from Sao Joao del Rei. In 2023, IFC invested in BM  to further develop the MOE technology  platform and expand operations in the United States and Brazil (https://disclosures.ifc.org/project-detail/ESRS/47774/boston-metal). Based on IFC’s supervision to date, the company’s environmental and social (E&S) performance has been satisfactory.  IFC is considering a C Loan of US$50 million to finance industrial Phases I and II (“the Project”). The Project requires up to US$100 million in debt financing, and IFC is mobilizing the remaining balance of US$50 million in parallel loans. Upon the completion of industrial Phase II, BMB will have the capacity to produce over 11,000 tons per year of high value metals, including ferro tin (FeSn), ferro tantalum niobium (FeTaNb), ferro tantalum (FeTa) and ferro niobium (FeNb). Phase I will include one electric furnace 3MVA and one electrolytic cell of 60kA (MOE) for processing approximately 7000 tons of metallurgical slag annually; Phase II will add one additional electric furnace 18MVA and four 300kA electrolytic cells (MOE) that will increase processing capacity to over 81 000 tons of slag per year. Charcoal will be used to produce part of the energy needed for the electric furnace and limestone will be used as a fluxing agent to remove impurities in the process. Processed steel scrap will be added to adjust the Fe content in both FeNb and FeTa alloys, ensuring the desired composition. Two transmission lines will connect the new facility to the national power electrical grid, located approximately 1.3km from the site. The project will use slag, a byproduct of mining and metallurgical processes primary composed of metal oxides and silica and up to %5 of naturally occurring radionuclides, namely Uranium and Thorium. After MOE processing, sludge (that is, the slag remaining from the MOE process) will still contain valuable oxides such as Zirconium and Rare Earth Metals that could be recovered in the future once appropriate technology becomes available.  Phase I is currently under construction and operations are expected to start in the second semester of 2025. Operations of Phase II are anticipated to commence in 2026. In the production process, the slag will be dried before being fed into an electric arc furnace for melting and where FeSn ferroalloy will be produced. The molten slag will be then transferred to an electrolysis cell to produce ferroalloys such as ferro tantalum niobium (FeTaNb), ferro tantalum (FeTa) and ferro niobium (FeNb). After MOE electrolysis, the sludge will be solidified, dried, and sent back to the slag owner. Recovered ferroalloys can be poured into ingots or other forms and temporarily stored for shipment to customers.

Original sector

B-BG - All Other Metal (Including Tin, Tantalum, Tungsten, etc.)

Location

Country

Brazil

Source

Source

International Finance Corporation (IFC)

URL

More Details

Record type

Project

Sector

Steel, Nuclear, Warehouse, Metal, Chemical (Industrial), Manufacturing (Industrial), Power Generation (CCGT), Government

Article published date

2026-01-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project