Botos Biogas Power Plant
Active · Serbia
Source: World Bank Group
Th project entails the construction of 0.6MW biogas power plant in Botos, Serbia. The sponsors are Mladost doo Botos, an agricultural co-operative in Botos, Zrenjanin, and Bioelektra doo Botos. ,Beet pulp and sugar beet waste, supplemented with corn silage, are digested. The heat is used to heat up the digester while the electricity is fed into the national grid. The project, worth €2.5 million, w
- Status
- Prospective
- Sector
- Government, Biomass, Raw Materials, Power Generation (CCGT), Commercial
- Location
- Serbia
- Updated
- 19 Nov 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Botos Biogas Power Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Th project entails the construction of 0.6MW biogas power plant in Botos, Serbia. The sponsors are Mladost doo Botos, an agricultural co-operative in Botos, Zrenjanin, and Bioelektra doo Botos. ,Beet pulp and sugar beet waste, supplemented with corn silage, are digested. The heat is used to heat up the digester while the electricity is fed into the national grid. The project, worth €2.5 million, was financed with a €1.2 million credit line from Erste Bank, alongside a €688,000 loan from the government of the Netherlands. The project was also helped with US$275,000 as a part of project ‘Reducing Barriers to Accelerate Development of Biomass Markets in Serbia’, financed by the Global Environmental Fund and delivered by United Nations Development Programme, in partnership with the Serbian Ministry of Mining and Energy. Financial close was reached on 19 December 2014. Acucomm files |
Original sector | Energy |
Budget |
Location
Country | Serbia |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Government, Biomass, Raw Materials, Power Generation (CCGT), Commercial |
Article published date | 2024-09-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
