logo
ProjectClosed

Botswana - Morupule B Generation and Transmission Project

Sector: Solar • Location: Botswana

Source: World Bank

The objectives of the Morupule B Generation and Transmission Project are to support Botswana in: (i) developing reliable and affordable supply of electricity for energy security; (ii) promoting alternative energy resources for low-carbon growth; and (iii) building its institutional capacity in the energy sector. There are three components to the project. The first component of the project is Morup

Status
Closed
Sector
Solar, Water Supply and Storage, Power Generation (CCGT), Natural Gas, Geothermal, Commercial, Government
Location
Botswana
Updated
22 Jul 2026
Source
World Bank

ConstructChat

Ask ConstructChat about Botswana - Morupule B Generation and Transmission Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Botswana - Morupule B Generation and Transmission Project” is an infrastructure initiative in the Solar sector, located in Botswana. Taiyo aggregates data on it from World Bank.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The objectives of the Morupule B Generation and Transmission Project are to support Botswana in: (i) developing reliable and affordable supply of electricity for energy security; (ii) promoting alternative energy resources for low-carbon growth; and (iii) building its institutional capacity in the energy sector. There are three components to the project. The first component of the project is Morupule generation expansion. This component, to be implemented by Botswana Power Corporation (BPC), includes three distinct and integral infrastructure subcomponents as follows: the first sub-component is Morupule B power station involves construction of a 600 MW coal-fired power station, adjacent to the existing Morupule A Power Station near Palapye, in the eastern part of the country; the second sub-component is transmission system involves construction, supply and installation of: (a) Morupule Phokoje 400 kV transmission line (102 kilometer (km) and associated equipment; and (b) Morupule-Isang 400 kV transmission line (215 km) and associated equipment; and the third sub-component of the project is water supply system involves construction of: (a) pipeline from the new Paje well field to the Morupule B Power Station (80 km) for backup supply; and (b) power supply line for the new Paje well field. The second component of the project is alternative energy development. This component will support diversification of Botswana's economy through a low-carbon growth strategy. Given Botswana's energy endowment, its cleaner fuel options are to develop coal-bed methane and to explore solar thermal, while examining prospects for carbon capture and storage as a means to mitigate climate change impacts. The third component of the project is institution and capacity building. This component covers project implementation assistance, institutional and capacity building for BPC and the Ministry of Minerals, Energy, and Water Resources (MMEWR).

Original sector

FY17 - Energy and Extractives

Budget

Location

Country

Botswana

Source

Source

World Bank

URL

More Details

Record type

Project

Sector

Solar, Water Supply and Storage, Power Generation (CCGT), Natural Gas, Geothermal, Commercial, Government

Article published date

2025-12-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project