logo

Botswana - North-Eastern Water Developpement Study

Sector: Water Supply and Storage • Location: Botswana

Source: African Development Bank (AfDB)

Project

The study will be divided into two phases: Phase 1 - Preliminary Studies ------------------- Projections of water demand ---------------------------- (a) Francistown : The consultant shall asseas the current projections of water demand for Francistown and forecast the effects of a decision to locate "Wet" industries there. (b) Mining Projects : Estimates of water demand associated with ---------

Project Information FAQ

Project Information

4 Q
The project “Botswana - North-Eastern Water Developpement Study” is an infrastructure initiative in the Water Supply and Storage sector, located in Botswana. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The study will be divided into two phases: Phase 1 - Preliminary Studies ------------------- Projections of water demand ---------------------------- (a) Francistown : The consultant shall asseas the current projections of water demand for Francistown and forecast the effects of a decision to locate "Wet" industries there. (b) Mining Projects : Estimates of water demand associated with --------------- possible new mines should be made with assumptions as to the techniques and scale of mining operations clearly stated. (c) Rural Requirements : Rural Water requirements capable of being ------------------ economically served from proposed water sources and transfer systems ------------ should be identified. Phase 2. Project Feasibility studies --------------------------- A. Both accelerated and decelorated population growth of Francistown. B. Extension of water borne sewerage to low income areas. C. A rephasing of the proposed mining project at selkirk-Pheonix.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data