Botswana - The Morupule B Power Project
Sector: Water Supply and Storage • Location: Botswana
Source: African Development Bank (AfDB)
The Morupule B project is adopted as the least cost solution to guarantee electricity supply self sufficiency facing the many challenges in the energy sector in Botswana. The project consists in the construction of a 600 MW (4 x 150 MW) coal fired power plant and associated transmission infrastructure. The Morupule B plant should be located adjacent to the existing Morupule A plant, at a mine-mout
- Sector
- Water Supply and Storage, Power Generation (CCGT), Government
- Location
- Botswana
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Botswana - The Morupule B Power Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Morupule B project is adopted as the least cost solution to guarantee electricity supply self sufficiency facing the many challenges in the energy sector in Botswana. The project consists in the construction of a 600 MW (4 x 150 MW) coal fired power plant and associated transmission infrastructure. The Morupule B plant should be located adjacent to the existing Morupule A plant, at a mine-mouth. It is of great strategic importance for Botswana as it will contribute to national energy security and improving the competitiveness of the national economy. The project costs, excluding custom taxes and duties, financing fees and Interest During Construction (IDC) on the ICBC-SB loan, are estimated at US$ 1,394.3 million (UA 905.4 million) based on cost estimates as at June 2009. It comprises five components: (i) Power Plant (including the fuel for commissioning); (ii) Water Supply System Development; (iii) Power Transmission System and Substations; (iv) Technical Assistance; and (v) Project Supervision & Management. |
Original sector | Energy |
Budget |
Location
Country | Botswana |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Government |
Article published date | 2025-03-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Botswana
- Lobatse drinking water project
- GABORONE WATER SUPPLY
- LOBATSE WATER
- FRANCISTOWN WATER SUPPLY
- NORTH SOUTH CARRIER (NSC)
- Botswana - The Pandamatenga Agricultural Infrastructure Development Project
- Botswana - Botswana Wastewater Reuse and Water Harvesting For Irrigation Study
- Botswana - Gaborone-Lobatse Water - Supply
