logo

Botswana - The Morupule B Power Project

Sector: Water Supply and Storage • Location: Botswana

Source: African Development Bank (AfDB)

Project

The Morupule B project is adopted as the least cost solution to guarantee electricity supply self sufficiency facing the many challenges in the energy sector in Botswana. The project consists in the construction of a 600 MW (4 x 150 MW) coal fired power plant and associated transmission infrastructure. The Morupule B plant should be located adjacent to the existing Morupule A plant, at a mine-mout

Project Information FAQ

Project Information

4 Q
The project “Botswana - The Morupule B Power Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Botswana. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Morupule B project is adopted as the least cost solution to guarantee electricity supply self sufficiency facing the many challenges in the energy sector in Botswana. The project consists in the construction of a 600 MW (4 x 150 MW) coal fired power plant and associated transmission infrastructure. The Morupule B plant should be located adjacent to the existing Morupule A plant, at a mine-mouth. It is of great strategic importance for Botswana as it will contribute to national energy security and improving the competitiveness of the national economy. The project costs, excluding custom taxes and duties, financing fees and Interest During Construction (IDC) on the ICBC-SB loan, are estimated at US$ 1,394.3 million (UA 905.4 million) based on cost estimates as at June 2009. It comprises five components: (i) Power Plant (including the fuel for commissioning); (ii) Water Supply System Development; (iii) Power Transmission System and Substations; (iv) Technical Assistance; and (v) Project Supervision & Management.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data