Botswana - The Morupule B Power Project

Sector: Water Supply and Storage • Location: Botswana

Source: African Development Bank (AfDB)

The Morupule B project is adopted as the least cost solution to guarantee electricity supply self sufficiency facing the many challenges in the energy sector in Botswana. The project consists in the construction of a 600 MW (4 x 150 MW) coal fired power plant and associated transmission infrastructure. The Morupule B plant should be located adjacent to the existing Morupule A plant, at a mine-mout

Sector
Water Supply and Storage, Power Generation (CCGT), Government
Location
Botswana
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Botswana - The Morupule B Power Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Botswana - The Morupule B Power Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Botswana. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Morupule B project is adopted as the least cost solution to guarantee electricity supply self sufficiency facing the many challenges in the energy sector in Botswana. The project consists in the construction of a 600 MW (4 x 150 MW) coal fired power plant and associated transmission infrastructure. The Morupule B plant should be located adjacent to the existing Morupule A plant, at a mine-mouth. It is of great strategic importance for Botswana as it will contribute to national energy security and improving the competitiveness of the national economy. The project costs, excluding custom taxes and duties, financing fees and Interest During Construction (IDC) on the ICBC-SB loan, are estimated at US$ 1,394.3 million (UA 905.4 million) based on cost estimates as at June 2009. It comprises five components: (i) Power Plant (including the fuel for commissioning); (ii) Water Supply System Development; (iii) Power Transmission System and Substations; (iv) Technical Assistance; and (v) Project Supervision & Management.

Original sector

Energy

Budget

Location

Country

Botswana

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Generation (CCGT), Government

Article published date

2025-12-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project