logo

Botswana - The Pandamatenga Agricultural Infrastructure Development Project

Sector: Residential • Location: Botswana

Source: African Development Bank (AfDB)

Project

The Pandamatenga Agricultural Infrastructure Development Project was initiated because of the priority given by Government of Botswana owing to the area’s inherent potential to increase cereal production. Indeed, Pandamatenga area is highly suitable for arable agriculture because of a relatively high rainfall of 600mm per annum and inherently fertile soil. The present project will facilitate water

Project Information FAQ

Project Information

4 Q
The project “Botswana - The Pandamatenga Agricultural Infrastructure Development Project” is an infrastructure initiative in the Residential sector, located in Botswana. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Pandamatenga Agricultural Infrastructure Development Project was initiated because of the priority given by Government of Botswana owing to the area’s inherent potential to increase cereal production. Indeed, Pandamatenga area is highly suitable for arable agriculture because of a relatively high rainfall of 600mm per annum and inherently fertile soil. The present project will facilitate water control and access road development for rain fed agricultural production within 27,574 ha of farm land in Pandamatenga area. It will incorporate water management and ecosystem conservation concepts in crop production, train beneficiaries and provide equipment for effective production activities. The project will support the construction of drainage and road infrastructure within 27,574 ha rain-fed systems; strengthen human and logistic capacities of the MoA and farmer associations. It comprises three main components: 1) Infrastructure Development; 2) Agricultural Production Improvement; and 3) Project Coordination.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data