Botswana - The Pandamatenga Agricultural Infrastructure Development Project
One of 754 projects Taiyo tracks in Botswana.
Source: African Development Bank (AfDB)
The Pandamatenga Agricultural Infrastructure Development Project was initiated because of the priority given by Government of Botswana owing to the area’s inherent potential to increase cereal production. Indeed, Pandamatenga area is highly suitable for arable agriculture because of a relatively high rainfall of 600mm per annum and inherently fertile soil. The present project will facilitate water
- Sector
- Residential, Commercial, Warehouse, Water Supply and Storage, Fertilizers, Consumer Products, Solar, Road, Raw Materials, Rail, Government, Waste Processing and Treatment
- Location
- Botswana
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Botswana - The Pandamatenga Agricultural Infrastructure Development Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Pandamatenga Agricultural Infrastructure Development Project was initiated because of the priority given by Government of Botswana owing to the area’s inherent potential to increase cereal production. Indeed, Pandamatenga area is highly suitable for arable agriculture because of a relatively high rainfall of 600mm per annum and inherently fertile soil. The present project will facilitate water control and access road development for rain fed agricultural production within 27,574 ha of farm land in Pandamatenga area. It will incorporate water management and ecosystem conservation concepts in crop production, train beneficiaries and provide equipment for effective production activities. The project will support the construction of drainage and road infrastructure within 27,574 ha rain-fed systems; strengthen human and logistic capacities of the MoA and farmer associations. It comprises three main components: 1) Infrastructure Development; 2) Agricultural Production Improvement; and 3) Project Coordination. |
Original sector | Agriculture, Forestry, Fishing |
Budget |
Location
Country | Botswana |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Residential, Commercial, Warehouse, Water Supply and Storage, Fertilizers, Consumer Products, Solar, Road, Raw Materials, Rail, Government, Waste Processing and Treatment |
Article published date | 2025-03-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Residential projects in Botswana
- Lobatse drinking water project
- BDC Botswana NHFO-SOE
- Botswana - Capacity Building to the Ministry of Agriculture
- Botswana - Statistical Capacity Building (SCB II) in Regional Member Countries for MDG Monitoring & Results Measurement
- Tshele Hills Oil Storage Development PPP Project near Rasesa village
- Kalahari Diamond
- Chilwero Lodge
- ABCH & Subs.
