logo
Project

Botswana - The Pandamatenga Agricultural Infrastructure Development Project

One of 754 projects Taiyo tracks in Botswana.

Source: African Development Bank (AfDB)

The Pandamatenga Agricultural Infrastructure Development Project was initiated because of the priority given by Government of Botswana owing to the area’s inherent potential to increase cereal production. Indeed, Pandamatenga area is highly suitable for arable agriculture because of a relatively high rainfall of 600mm per annum and inherently fertile soil. The present project will facilitate water

Sector
Residential, Commercial, Warehouse, Water Supply and Storage, Fertilizers, Consumer Products, Solar, Road, Raw Materials, Rail, Government, Waste Processing and Treatment
Location
Botswana
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Botswana - The Pandamatenga Agricultural Infrastructure Development Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Botswana - The Pandamatenga Agricultural Infrastructure Development Project” is an infrastructure initiative in the Residential sector, located in Botswana. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Pandamatenga Agricultural Infrastructure Development Project was initiated because of the priority given by Government of Botswana owing to the area’s inherent potential to increase cereal production. Indeed, Pandamatenga area is highly suitable for arable agriculture because of a relatively high rainfall of 600mm per annum and inherently fertile soil. The present project will facilitate water control and access road development for rain fed agricultural production within 27,574 ha of farm land in Pandamatenga area. It will incorporate water management and ecosystem conservation concepts in crop production, train beneficiaries and provide equipment for effective production activities. The project will support the construction of drainage and road infrastructure within 27,574 ha rain-fed systems; strengthen human and logistic capacities of the MoA and farmer associations. It comprises three main components: 1) Infrastructure Development; 2) Agricultural Production Improvement; and 3) Project Coordination.

Original sector

Agriculture, Forestry, Fishing

Budget

Location

Country

Botswana

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Residential, Commercial, Warehouse, Water Supply and Storage, Fertilizers, Consumer Products, Solar, Road, Raw Materials, Rail, Government, Waste Processing and Treatment

Article published date

2025-03-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project