logo

Botswana Solar Phase 2

Sector: Water Supply and Storage • Location: Botswana

Source: International Finance Corporation (IFC)

Project
Active

 IFC’s proposed investment consists of an A loan of up to $19 million for the development of the greenfield 50MWac Mmadinare Solar PV Facility (the “Project” or “Phase 2”), located on a 140-hectare site, approximately 5.8 km northwest of Selebi Phikwe and 9.2 km southeast from Mmadinare, in the Selebi Phikwe District of Botswana. Phase 2 of the Mmadinare Solar Complex will be adjacent to the 50 MW

Project Information FAQ

Project Information

4 Q
The project “Botswana Solar Phase 2” is an infrastructure initiative in the Water Supply and Storage sector, located in Botswana. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

 IFC’s proposed investment consists of an A loan of up to $19 million for the development of the greenfield 50MWac Mmadinare Solar PV Facility (the “Project” or “Phase 2”), located on a 140-hectare site, approximately 5.8 km northwest of Selebi Phikwe and 9.2 km southeast from Mmadinare, in the Selebi Phikwe District of Botswana. Phase 2 of the Mmadinare Solar Complex will be adjacent to the 50 MWac Selebi Phikwe Project (Phase 1) that is currently under construction, bringing the total capacity of Phase 1 and 2 to 100 MWac. The Project will be a replica of Phase 1 that consists of the construction, operation, and maintenance of a 50 MWac (60 MWp), grid connected, ground mounted solar PV plant. The power plant will connect into a spare bay of the substation built for Selebi Phikwe Solar. Scatec ASA (“the Company”), a Norwegian based renewable energy company, was awarded Phase 2 by the Botswana Power Corporation (BPC) on April 18, 2023. Scatec, through its subsidiary Mmadinare Solar (Pty) Ltd, has entered into a Power Purchase Agreement (PPA) with the BPC that will allow for the development, construction, testing, commissioning, operation, and maintenance of the 50MWac solar PV facility for a period of 25 years. At the end of this term, the Project will be decommissioned or repowered. Scatec Botswana Operations (Pty) Ltd has been established as the Project Special Purpose vehicle (SPV), and will also assume the role of the Engineering, Procurement and Construction (EPC) contractor, the Operations and Maintenance (O&M) contractor and Asset Manager for the project.  Previous IFC exposure to the client in Botswana started with the Phase 1 Selebi Phikwe Solar disclosed on 23 June 2023 (https://disclosures.ifc.org/project-detail/ESRS/44613/botswana-solar) and whose construction commenced in November 2023.                                                   

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data