IFC will support the development of a greenfield 50 MWac (60 MW peak capacity) solar PV power plant (the “Project”) in a 121 hectares site located about 3.6 km from Selebi-Phikwe town and approximately 6.8 km from Mmadinare village in eastern Botswana. Botswana Power Corporation (“BPC”) issued an open and competitive RFQ in August 2019 and in August 2021 selected Scatec (Sponsor) to build, own, op
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | IFC will support the development of a greenfield 50 MWac (60 MW peak capacity) solar PV power plant (the “Project”) in a 121 hectares site located about 3.6 km from Selebi-Phikwe town and approximately 6.8 km from Mmadinare village in eastern Botswana. Botswana Power Corporation (“BPC”) issued an open and competitive RFQ in August 2019 and in August 2021 selected Scatec (Sponsor) to build, own, operate and transfer the solar plant. The Project will be supplying power to BPC under a 25-year Power Purchase Agreement (“PPA’) signed on August 31, 2022.Power generated at the plant will be fed into the national grid via a 250 m loop-in-loop-out (LILO) transmission line at 220kV which feeds into the existing Phokoje substation. Other ancillary facilities include an upgrade of existing access road of 2.5km and construction of a new 1.5km access road.Ownership of the project (the Project Special Purpose Vehicle (SPV)) is Selebi-Phikwe Solar (Pty) Ltd, a 100% owned subsidiary of Scatec Netherlands. A sell down of 40% of shares in the Project Company to local Botswana investors is envisioned within 5 years after Commercial Operation Date (“COD”) on a best-effort basis. Scatec also incorporated Scatec Botswana Operations (Pty) Ltd which will act as the Engineering, Procurement and Construction (EPC) contractor, the Operations and Maintenance (O&M) contractor and Asset Manager for the project while outsourcing certain specialist roles to subcontractors, managed by the Asset Manager. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Solar projects in Botswana
- Botswana - The Pandamatenga Agricultural Infrastructure Development Project
- Botswana - Feasibility Study for a 200 Megawatts Concentrating Solar Power Plant
- Botswana - Feasibility Study for a 200 Megawatts Concentrating Solar Power Plant
- Botswana - The Pandamatenga Agricultural Infrastructure Development Project
- Botswana - The Pandamatenga Agricultural Infrastructure Development Project
- Botswana Solar
- Botswana Solar Phase 2
- Gaborone Smart City Master Plan