Bottineau City - Electrical Vault & Beacon Foundations REBID
Sector: Power Generation (CCGT) • Location: Bottineau, North Dakota, United States of America
Source: Dodge
Project work consists of but is not limited to the following: Foundation demolition, beacon tower relocation, electrical vault relocation, foundation construction, painting, directional boring, and electrical construction. Construction for this project is to take place over 21 calendar days between the dates of August 11, 2025 and October 10, 2025. (M&H #4265800-230102.01, AIG #3-38-0004-022-2025)
- Status
- Closed
- Sector
- Power Generation (CCGT), Government, Power Transmission, Commercial
- Location
- Bottineau, North Dakota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Bottineau City - Electrical Vault & Beacon Foundations REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bid results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project work consists of but is not limited to the following: Foundation demolition, beacon tower relocation, electrical vault relocation, foundation construction, painting, directional boring, and electrical construction. Construction for this project is to take place over 21 calendar days between the dates of August 11, 2025 and October 10, 2025. (M&H #4265800-230102.01, AIG #3-38-0004-022-2025) |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Dakota |
City | Bottineau |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Government, Power Transmission, Commercial |
Article published date | 2025-07-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
