logo

Bottoms Bridge Control Valve

Sector: Bridge • Location: Quinton, Virginia, United States of America

Source: Dodge USA

Project
Closed

The Project includes the following Work: Construction of a new control valve on the site of the Bottoms Bridge Elevated Water Tank including the installation of a motorized valve in a fiberglass shelter and installation of roughly 200 linear feet of 12 waterline.

Status
Closed
Sector
Bridge, Water Supply and Storage, Road, Government, Commercial
Location
Quinton, Virginia, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Bottoms Bridge Control Valve

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Bottoms Bridge Control Valve” is an infrastructure initiative in the Bridge sector, located in Quinton, Virginia, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Project includes the following Work: Construction of a new control valve on the site of the Bottoms Bridge Elevated Water Tank including the installation of a motorized valve in a fiberglass shelter and installation of roughly 200 linear feet of 12 waterline.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Virginia

City

Quinton

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Bridge, Water Supply and Storage, Road, Government, Commercial

Article published date

2024-07-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project